Project: Lance's_650B   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Lance Miller   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:667.8
Start/Last Date:Dec 10, 2015 - No Finish Date
Engine:Corvair 2850
Propeller:Warp Drive
Panel:Probably steam gauge + iPad mini mount
 
Friendly URL: https://eaabuilderslog.org?s=Lance's_650B

Home or Last Project Picture

Jul 02, 2023     Pitot inspection panel - (3 hours)       Category: Wings
Spent a lot of time just looking at it to see what i want to do. I decided to mount the pitot tube on an inspection panel so i can remove it when moving the wing or during inspetion. So I had to figure out a way to reinforce the panel against flexing, especially since the probe is the Dynon heated probe and pretty weighty.
I cut out a piece of 0.025 6061 T6 and drilled and cut out the pitot tower dewdrop hole. I finished the night by riveting (the solid rivets that Dynon provides) the angle nutplates onto the pitot tower base.
I haven't built the L angle box for it on the wing yet.


 